Hydrog
HydrologyKitchener, Ontario, Canada
Assessment of the property included a hydrogeology study in support of a Category 3 PTTW application for construction of the athletic facility building and pool. The scope of work initially comprised slug testing of on-site monitoring wells; water chemistry sampling; and assessment of dewatering requirements for both construction of the facility and for the permanent groundwater collection system. Subsequent tasks included drilling additional boreholes completed as monitoring wells to delineate the extent of soil and groundwater contamination. Maximum daily dewatering flow calculations were performed, and adjacent water supply wells and sensitive areas were assessed for potential impacts. Recommendations were provided for treatment of the dewatering discharge to meet applicable City and MOECC guidelines..
Hydrogeological investigation to support a Category 3 PTTW application for servicing reconstruction. Groundwater chemistry impacts were assessed, along with nearby water supply wells and surface water features. Recommendations were provided for treatment of the dewatering discharge to meet applicable City and MOECC guidelines, and supplementary investigations of surface water chemistry and construction dewatering discharge were completed to satisfy MOECC concerns prior to the issuance of the PTTW. Upon commencement of dewatering operations, weekly groundwater chemistry monitoring was initiated.
- Website
- https://hydrog.ca/
